For multi-unit restaurant brands

Every new store opens like your best one.

Your brand standards adapted to each site with our design team, then reviewed in live 3D with your project stakeholders before construction. Design, equipment and installation coordination from Concept Services.

Restaurant-focused designEquipment coordinationShared project workspace
Your rolloutExample
Openings22
On track19
Watch3
Dallas, TXFoodservice drawings
On track
Phoenix, AZSite survey
Watch
Denver, COGrand opening
Opens Fri
Open item closed

Grease trap capacity confirmed

Illustrative example with sample data. Not a live customer account.

Why openings slip

Openings don't slip from one disaster. They slip from a hundred small ones.

A hood that doesn't match the plan. An equipment change late in the project. A layout waiting for review. Bring the drawings, decisions and project conversation together before construction.

Without Brand Builder

  • Status lives in a separate spreadsheet
  • The latest layout is in somebody's inbox
  • Equipment questions are split across email threads
  • The project team works from different documents
  • The next site needs its own layout review

With Brand Builder

  • Project stages, target dates and next actions in one workspace
  • Project files with their version history
  • Equipment coordination with the Concept Services team
  • Shared project documents and messages for invited participants
  • Work with our designers to adapt your brand standards to each site

What you get

Four ways to keep your next opening moving

A design team and a project workspace. Team-led design services and customer software features each have a part to play.

Review the layout together

Walk through your restaurant layout in live 3D working sessions with our design team. Discuss kitchen flow, equipment placement and changes with your project stakeholders before construction.

Concept Services design service
FocusResolve layout questions before construction

Hand your architect and engineer a coordinated package

Work with our designers on the drawings, equipment specifications and documentation agreed for your project. Keep those files and their version history together in Brand Builder.

Design documentation · Project files · Drawing preview
FocusKeep the project documents together

Give your GC the current project documents

Invite your contractor to the project and keep the relevant files and conversations together. Access is scoped to the project and the participant's role.

Project files · Project messages · Project access
FocusA shared place for project coordination

Know where each site stands

See recorded stages, target dates, opening status and next steps. Find your authorized project locations on the map and bring current information to your rollout meeting.

Project dashboard · Project map · Notifications
FocusSee the next project question to address

Inside Brand Builder

One screen for your openings, with the next step in view.

Bring your team and invited project participants into a shared workspace. Review the information recorded for each location.

  • Project stages and target opening dates
  • Recorded risks and pending project items
  • Project owners and next actions, where assigned
Brand Builder · sample workspace
Brand Builder
  • Dashboard
  • Projects
  • Map
  • Files
  • Messages
  • People

Opening overview

Your brand · 22 active openings · sample data

Active22
On track19
Watch3
Blocked0
Miami, FL #118Foodservice drawings · target Oct 30On track
Charlotte, NC #121Test fit · target Nov 20On track
Nashville, TN #124Site survey · target Dec 11Watch
Boston, MA #109Grand opening · target FriOpening Friday
Example open item · Nashville, TN #124 · Owner: Sarah, Development leadLandlord utility report missing gas capacityNext action: request from landlord · due today
Illustrative layout with sample data, not a screenshot or a live customer account. Your workspace shows the projects you can access.

How it works

Plan each location around the same five steps

Use this sequence to plan the work with your team. Confirm site capture, modeling, deliverables and responsibilities in your project's scope.

  1. Scan

    Confirm the existing-condition information and whether a site scan is needed.

  2. As-Builts

    Agree on the existing-condition drawings and modeling your project requires.

  3. Test fit

    Review the layout with our designers in live 3D working sessions.

  4. Coordinate

    Align equipment requirements and documentation with your design and construction teams.

  5. Open

    Keep stages, target dates and next steps in view as the project moves toward opening.

Your team does: Site information, stakeholder reviews and decisions on the questions that need your input.
We do: The design, equipment and installation coordination agreed for your project.

Put your own numbers in

What does a late opening put at stake?

Explore the gross sales deferred and additional fixed costs if each planned opening runs late.

Deferred gross sales$1,440,000
Additional rent & fixed costs$90,000
Illustrative exposure$1,530,000

Not profit, net loss or guaranteed savings.

Talk through my rollout

Assumes the same delay and weekly figures for every opening. Amounts are rounded to the nearest dollar. A planning illustration, not a financial forecast.

Partnership

For brands naming a system-wide partner

Start with a conversation about your rollout. Scope, success measures and supplier status are agreed with your team—not assumed.

Pilot

Discuss which initial locations would help you evaluate working together, and agree on scope, responsibilities and success measures.

Approved partner

Review the results against your requirements. Your team decides whether the relationship belongs on your approved supplier list.

Designated partner

If your team is considering a system-wide relationship, discuss responsibilities, service expectations and how you will review performance.

One team, scan to start-up

Design, equipment and installation from the same people

Brand Builder is run by Concept Services, so the team that designs your layout can also help coordinate equipment sourcing, delivery and installation with your project team.

Design

Review the layout

Work through kitchen flow and equipment placement in team-led 3D sessions.

Procure

Specify and source

Coordinate equipment requirements and purchasing for your restaurant projects.

Install

Deliver and install

Coordinate delivery and installation with your project team and general contractor.

Reorder

Your approved package

Ask our team about your approved equipment package and reorder process.

Clients

What development leaders say about working with us

“Concept Services has been a key component in our expansion since the St. Louis Bread Company days. Their flawless execution lets us focus on long-term growth.”
Ken SiskVice President Construction, Panera Bread
“They stand by their work with relentless customer service, timely responses, and innovative thinking. Concept Services meets every curveball our growth throws at them.”
Jason WaldChief Innovation Officer, Torchy’s Tacos
“For eight years they have owned our remodels, new builds, and equipment rollouts. Design, procurement, install, and training are consistently exemplary.”
Kyle RitterExecutive Chef, Airport Foodservice
“Every project requires hand-holding and special attention. They are so dependable that we trust them with all of our work—no exceptions.”
Sonny LongSenior VP Construction & Development

Questions brands ask

Common questions

What does the design scope cover?

We agree the scope for your project with you, including the layouts, equipment specifications and documentation you need. Site capture, modeling and other deliverables should be confirmed as part of that scope.

How do our franchisees participate?

Invite people to a specific Brand Builder project, with access based on their role. Ask our team separately about equipment ordering and your approved package.

Is this software, a service, or both?

Both. Brand Builder is the project workspace. Concept Services provides design, equipment and installation coordination. Live 3D working sessions are a team-led design service, not a promise of an in-app collaborative 3D approval feature.

How do we coordinate the architect, engineer and contractor?

Keep project stages, dates, files and messages together. Invite participants to the project and use the workspace to discuss the next steps with your team. It does not replace your architect, engineer or general contractor.

We're opening fewer than 10 stores a year. Can we still talk?

Tell us about your planned locations and the work you need help coordinating. We can discuss whether the scope is a fit.

Do you replace our architect or engineer?

No. We work alongside your architect, engineer and contractor on the design documentation and equipment coordination agreed for the project.

How much of our team's time does this take?

Plan for sharing site information, reviewing layouts and making project decisions. The number of working sessions and reviews depends on your scope and the changes your team needs.

Book a walkthrough

See your next openings in Brand Builder

Bring your opening schedule. In 15 minutes we'll discuss your next locations, the questions on your list and how Brand Builder could support your team.

  1. Discuss your sites and target dates
  2. Talk through your design and equipment questions
  3. See how Brand Builder could support your team

The Concept Services team
15 minutes to discuss your rollout and the work you need coordinated.

Already a client? Log in to Brand Builder.

Rather talk now? Call 866-474-2537.

Pick a time

15 minutes with the Concept Services team.

Calendar not loading? Open calendar in a new tab.

What's new

Latest product updates

See what's new →
  1. When OpenAI has a problem (a rejected key, used-up credit, invalid requests or an outage), the team now gets an email within about 5 minutes, and a second one when it clears. Each problem is emailed at most once an hour.

  2. Adding people to projects works again. Since the November 4 update, adding someone to a project from their user page or a project's team failed with "Something went wrong".

  3. Every architect's signed Data Transfer Agreement downloads as one PDF per project and day: the signed agreement, the e-signature record and a list of every Revit file downloaded under it.